About Wajaale

Border town on the Berbera trade corridor, in Fafan Zone of the Somali Region.

Wajaale is a border town in Fafan Zone of Ethiopia's Somali Region. It is also written Tog Wajaale, Togochale, Togo Chale or Togo Wuchale. The town reaches right up to the border with Somaliland, where a twin town of the same name lies on the other side. Jijiga, the regional capital, is about 65 km away.

Wajaale is best known as a crossing point for trade. Goods that come through the port of Berbera reach Ethiopia along this road, and traders also send livestock the other way. A federal customs point opened in the town in 2010.

The 2007 national census counted 14,438 people in the town, which was then part of Awubere woreda. The Ethiopian Statistics Service projected about 22,000 residents for July 2021.

The town lies at roughly 1,550 metres above sea level. Days are mild for most of the year, and most rain falls in two seasons: around April and May, and again from about July to September.

Climate

Wajaale has a mild highland climate. Model data for 2001 to 2025 give a yearly mean temperature of about 20 °C and roughly 510 mm of rain a year. On average April is the wettest month (about 95 mm), with a second rainy spell from July to September (about 55 to 80 mm a month). December to February are dry, with under 10 mm a month. These are modelled averages for the town's location, not readings from a local weather station.

Two rainy seasons: the Gu rains from about April to June (on average April is the wettest month), and the Karan rains from about July to September, heaviest in August and September.

The warmest months are April and May (monthly mean about 22 °C); the coolest are December and January (about 17 to 18 °C).

Economy

Trade across the border is the town's main business. Wajaale is the main formal crossing on the Berbera corridor, the trade route that links Berbera port with Ethiopia, and it serves as a distribution point for imported goods. Traders also export livestock such as camels and cattle through the crossing. A federal customs point was set up here in 2010, and work on a 234 km road to Berbera began in 2019.

Where your water comes from

In the 2007 census, 792 of the town's 1,786 housing units (about 44%) got drinking water from a tap: 30 had a tap inside the house, 248 a tap in the compound and 514 used a tap outside the compound. Another 462 (26%) used a protected well or spring, 213 (12%) an unprotected well or spring, and 319 (18%) a river, lake or pond. The same census found that 1,032 of 1,787 housing units (58%) had no toilet.

A 2012 news report described a seasonal river along the border as a local water source, with water pumped from the Ethiopian side to the Somaliland side during a shortage. In May 2024 the Ethiopian News Agency reported that the Tog-Wochale water supply and sanitation project was under construction, at a cost of more than 490 million birr, to serve more than 56,000 residents.

History

  1. 2002 onwards

    From 2002 the Ethiopian government steered formal cross-border trade with Somaliland towards Tog Wajaale. The town then became the main formal crossing between the two sides and a distribution centre for imported goods, a large share of them shipped in containers through Berbera port.

    Sources (1)
  2. 2007

    The third national census counted Togo Chale town with 14,438 residents (7,797 men and 6,641 women). The census listed the town under Awubere woreda in Jijiga Zone.

    Sources (1)
  3. 2010

    The federal government set up new customs points along the Somaliland border, including one at Tog Wajaale, to bring more cross-border trade into formal channels.

    Sources (1)
  4. 2012

    A 2012 news report described a seasonal river that forms the border at the town. During a water shortage on the Somaliland side that year, about 20,000 litres of water a day were being pumped across from the Ethiopian side.

    Sources (1)
  5. 2019

    Work began on a 234 km road linking Togochale with Berbera port. The project was planned in three phases at a total cost of about US$400 million, financed by the Abu Dhabi Fund for Development.

    Sources (2)
  6. 2024

    A news report of 8 May 2024 said that water ministers from IGAD countries, UN agencies and development partners had visited the Tog-Wochale water supply and sanitation project, which was then under construction. The report put its cost at more than 490 million birr and said it would serve more than 56,000 residents.

    Sources (1)

Places to know

Historic places, landmarks, markets and nature around the city.

  • Landmark

    Wajaale border crossing

    The main formal crossing point between Ethiopia and Somaliland, on the trade road to Berbera port.

  • Government

    Federal customs point

    One of several customs points the federal government opened along the Somaliland border in 2010, to bring cross-border trade into formal channels.

    Sources (1)
  • The Ethiopian side of Wajaale in January 2011, with a Commercial Bank of Ethiopia branch in the centre. The border is a few hundred metres further along this road.Civic

    Commercial Bank of Ethiopia branch

    A branch of the Commercial Bank of Ethiopia on the main road through the Ethiopian side of town, a few hundred metres from the border. It was photographed there in January 2011.

    Photo: Brian Dell · CC0 · Wikimedia Commons

  • Health

    Togochale Health Center

    A health centre in the town that offers maternal, child, adolescent and reproductive health services. A health NGO reported that more people had started using it after referrals and service quality improved.

  • Transport

    Togechane Bus Station

    The town's bus station, near the town centre on the Ethiopian side of the border (mapped in 2011).

  • Nature

    Seasonal river at the border

    A seasonal river forms the border at the town. A 2012 report named it as one of the main water sources for residents on the Somaliland side.

    Sources (1)
  • Landmark

    Togochale to Berbera road

    Part of the Berbera corridor. Work began in 2019 on a 234 km road from Togochale to Berbera port, planned in three phases at a total cost of about US$400 million.

City map

Streets, or satellite imagery down to individual buildings.

Loading the map…